Generating the electric energy required for processing units of South Pars phases, South Pars Central Combined Cycle Power Plant project was started.  The capacity of this plant is 450 MW and the steam plant activities have been started since 2012 and the complex engineering and construction was assigned to FARAB and building engineering design and technical services have been allocated to DATAM MEC and the preparation of relevant documents which were in DATAM scope of work, was implemented in one year.

SOUTH PARS CENTRAL COMBINED CYCLE POWER PLANT

Location Assalouyeh, Boushehr, Iran
Client Pars Oil & Gas Co.
In Cooperation with Farab Co.
Time Duration 2014-2015