The objective of the project is transferring Methanol product of Mokran Petrochemical Complex from buffer tanks located in the complex to the tank farm which is located closed to Shahid Beheshti port. The pipeline length is about 30KM from the battery limit of complex to the entrance of the port.

The project basic engineering was assigned to SHARGAN and the basic engineering and design plant and pipelines have been allocated to DATAM MEC.

MOKRAN METHANOL BUFFER TANKS & TRANSMITION PIPELINES

Location Assaluyeh, Boushehr, Iran
Client MOKRAN Terminal & Tanks Co.
In Cooperation with Shargan co.
Time Duration 2017